C&DH Meeting 1/20/09
Today we got reacquainted with each other and went over what we did last semester
Next we broke back up into our groups from last semester and went over what we needed to update on our schematics and are going to have to complete all the sensors on them and email them to Gabe by Thursday, so we can fabricate the boards.
Class Meeting 1/21/09
Critical design reviews
• Talked to Gabe about new tasks.
• Learn programming environment and team lead process - Nick, Kevin
• We needed to redesign the INA2126 circuit in eagle because no sparkfun library on part - Carlos
• Updated the Bill of Materials - Rory
C&DH Meeting 1/27/09
• Went over entire schematic of main and sensor boards and double checked the bill of materials.
• Found all parts required and found supplier of each part
• Ordered Pizza
Class Meeting 1/28/09
• Went over individual timelines and need to make a timeline-Gabe
• Presentation needed next week for JPL meeting
○ Give present situation. Time-line, estimated time of launch
C&DH Meeting 2/3/09
• Put together parts and get ready to order from suppliers - Rory
-waiting for email
• Went over programming code of the ARM-7
• Need to meet Wed. or Thur. to go over sensor board layout w/Gabe
Class Meeting 2/4/09
Meeting with JPL
Gabe presented our timeline/process and listened to all team presentations.
Sunday Meeting 2/8/09
Connected and routed sensor and Main board on eagle to get it reader to send into the manufacturer for fabrication - Rory, Kevin, Carlos
C&DH Meeting 2/17/09
• Things that need to be done
• Populate main board - Rory, Kevin
• Populate sensor board, - Carlos
• Make molex connection for temperature sensor- Carlos, Kevin
• Go through and check off received parts- Rory, Kevin, Carlos
• Learn ARM programming environment- Tom, Nick
• Data Calculations- TBA
C&DH meeting 2/24/09
• To do
• Went over design process
• Make extensions and molex connectors for temperature sensors- 1.5 and 1 ft. possible extensions???
• Waiting for sensor board to populate
• Waiting for resistor to populate main board
Class Meeting 2/25/09
• Went over timeline - going to push launch back one week to first week in April
• Talked about the show and tell presentations for next week
• Went over Arial testing- parameters, power heat, how it works, improvements
C&DH Meeting 2/26/05
• Got Main board back from Greg - Tested the power supply, after some confusion confirmed that everything was ok and sent back to put everything, except through hole hardware to get put onto the board.
• Received the sensor board from PCG and sent to Greg to throw on Analog to Digital converter to test sensor before sending them to get permanently put on.
C&DH Meeting 3/11/09
• Document events
○ Time system powered on
○ Time launched
○ Time landed
○ Time shutdown
• Document launch problems
○ Operational
○ Integration
○ Desired Supplies / Tools
• CDH board operations
○ Status indicators
C&DH Meeting 3/24/09
• Had Sensor board populated
• Tested power supply on leading pins to make sure everything worked correctly
• Solder on through hole components - Carlos
• Continued working on programming environment - Nick
• Prepared batteries, and temperature leads - Kevin, Rory
Main board
• Hooked up to sensor board- received error with SPI port communication
○ Possibly header pin issue
○ Gabe figured out later that there was an issue with the SPI port, we were using a connection that was supposed to be a communication port to a slave and shouldn't be used for a master communication fixed in the programming .
Sensor board validation
• Pressure worked fine
• Accelerometer seems dead
○ Will conduct further tests
• All other sensors responded to the environment
○ Will have to do other testing for accuracy
Class Meeting 3/25/09
Need to make list of parts ordered for JPL and what they do
• What is it?
• What it does?
• Why bought, improvements to the old system?
• What improvements are we going to make next time?
C&DH Meeting 3/31/09
• Went over every sensor and through our checklist to make sure that everything was up and running.
• Made Remove Before Flight Tag to finalize the board and checklist
Class Meeting 4/1/09
• Met in hamshack to go over all equipment
• Made sure everything was compatible with all other teams
• Went over each teams prediction/readiness
○ Structures were unable to get the Kevlar composite shell finished, using another capsule to launch instead
○ Communications was unable to get communications up and running, had nothing to track balloon, cut down system was not working - they were planning on working Friday and Saturday for the launch
○ Science team found camera
○ We integrated to finish the pressure tube placement and GPS location in capsule, which was the last task. Temperature sensors were unresponsive.
Launch Day 4/5/09
• Turned on @ 7:14 AM, Did before the launch to make sure that we received a fix on location from the GPS
• Middle pressure sensor is denoted as the top package pressure
• Left pressure is denoted as the side pressure
• We were not able to recover the package. GPS stopped receiving location from package.
• Also, Communications team launched a separate tracking capsule which will make the accelerometer and gyroscope data useless, also because cut down system did not work so balloon also made sure that this data is useless
C&DH Meeting 4/7/09
Tasks left: Still no board so:
If board
○ Help Science team with Ariel control system
○ Do data calculations
If no board
○ Figure out problem with temperature sensors
§ Hook up through breadboard and troubleshoot
○ If fabricating a newer board:
§ Fix items that were cosmetically wrong – battery holder, rca jack, fix INA’s on schematic, etc…
§ Look through temperature sensor layout
§ On sensor board, pressure is too close, move back around
§ On main board- serial port needs to be moved away from standoff hole
§ Fix cable end to sensor board 180. All the way around
§ Debugger needs to be moved away from standoff hole
§ On sensor board, ginger interface needs to be moved away from ribbon connection
Class Meeting 4/8/09
• Went over post-launch reports from each team
• problems they encountered
• problems that can be fixed by next launch
• Goals for next launch
C&DH Meeting 4/14/09
• Updated post-launch report on the wiki
• Went over timeline for rest of the semester/before launch
○ Hardware problems/fixes - Kevin, Rory, Carlos
§ Fix BOM to order ceramic instead of tantalum
§ Order samples of MCP6022 for RTD circuit to test
§ Fix component problems on EAGLE
○ Fix programming environment, help science team with old data logger- Nick, Tom
• Need to create timeline for rest of semester in order to complete board manufacturing and order before end of semester
C&DH Meeting 4/21/09
- Logbooks Due Wednesday (4/29)
- Presentation Due Wednesday (4/29)
- What we have done
- What we are doing
- What we will do
- Lessons learned
- Changes to Sensor and Main boards
- Cosmetic changes
- Silkscreens
- INA2126 package changes
- RTD Circuit (possibly) - have to wait for chips to test
THE BOARD WAS RECOVERED!!!!!!!!!!!!!!
- New tasks since board was found:
- Interpret the data so we can turn in information to JPL
- Need to change presentation to interpret some of the data calculations
C&DH Meeting 5/5/09
- New team lead - Rory
- Troubleshooting RTD circuit
- Write notes for ARIAL control system- Nik
- Evaluate accelerometer data to determine if any consistency or error
- Give excel Data from launch to Dr. Atkinson
- Update launch report with graphs
- Walkthrough on C&DH supplies and parts
- Wish list- JPL
- GPS antenna
- Secondary temperature sensors
- SD card reader
- 1" and 1/2" standoffs
- 100 ohm RTD's
- Wish list - ARIAL
- Batteries
- GPS antenna cable
- GPS antenna
- SD card <= 1 GB
- Wish list - Optional
- Re fabricate boards (2nd copy)
- Buy parts to populate